Asphalt Paving in Portland, OR

Commercial asphalt paving for Portland, OR properties — fast, written estimates from a 20-year Pacific Northwest contractor.

A.C. Moate Industries is a commercial paving contractor serving Portland, OR and the greater Portland Metro area. Licensed contractor CCB #246397, in business since 1996.

Why Portland, OR Property Managers Choose A.C. Moate

Portland commercial managers choose A.C. Moate for asphalt paving because a lot built on a properly engineered base is what survives the Pacific Northwest's wet winters. From our Portland yard we pave new lots, overlays, and reconstructions across the metro and in Beaverton, Gresham, Tigard, Lake Oswego, and Vancouver WA. With prolonged rain saturating soils and driving raveling, we build drainage and compaction into the job so the surface holds up year after year.

What does asphalt paving in Portland, OR involve?

Asphalt paving in Portland involves preparing and compacting the base, establishing proper grade and drainage, and laying hot mix in a way that sheds water rather than holding it. We determine whether your lot needs a new build, an overlay, or full reconstruction based on the condition of the existing surface and base. In a wet-winter climate, grade and drainage are as important as the asphalt itself, because standing water is what shortens pavement life here. We sequence paving with any curb or drainage work so the finished lot moves water to where it belongs. Get in touch and we'll evaluate the site and provide a free, no-obligation estimate.

Areas We Serve Near Portland, OR

Beaverton · Gresham · Tigard · Lake Oswego · Vancouver WA

Frequently Asked Questions

What's the difference between an overlay and full reconstruction?

An overlay lays new asphalt over a sound existing base, while reconstruction rebuilds the base and surface where the foundation has failed. We base the recommendation on the condition of your base and pavement.

Why is drainage so critical for paving in Portland?

Portland's heavy winter rain means any low spot that holds water will fail faster. We set grade and drainage during paving so water runs off instead of soaking into the pavement.

How soon can a newly paved lot be used?

New asphalt needs time to cure before heavy use, and we'll give you guidance for your specific project. Striping is typically done after the surface has set.

Explore More

Get Your Free Portland, OR Estimate

Free, no-obligation written estimate for your commercial property.

Request Your Free Estimate

A.C. Moate Industries · kartzt@acmoate.com · 253-887-9501

Free Portland, OR Estimate Get Started